Meta Data
Title in national language: 
План мероприятий "Трансформация делового климата" (утв. Распоряжением Правительства Российской Федерации от 10.01.2019 №20-з в ред. 24.07.2021)
Draft: 
No
Revision of previous policy?: 
No
Draft Year: 
2019
Effective Start Year: 
2021
Scope: 
National
Document Type: 
Decree, Plan/Strategy
Economic Sector: 
Energy, Power
Energy Types: 
Power, Gas
Issued by: 
Government of the Russian Federation
Notes: 
No official English version available
Overall Summary: 
The Action Plan on Transforming the Business Climate aims to facilitate the technological connection of capital construction projects to the networks of engineering and technical support in Russia. It is proposed to make the procedure of connection (technological connection) to electric networks, gas distribution networks, heat supply systems, centralized water supply and sanitation systems simpler, faster, transparent and less costly. For this purpose it is planned to provide transition to the electronic form of submission of applications and documents necessary for technological connection of capital construction projects to networks of engineering support.
Access
Energy access action plan: 
1. Number of stages of technological connection to electric networks (units): Actual value: 3; 2019: 3; 2020: 3; 2021: 2; 2022: 2; 2023: 2; 2024: 2. 2. Term of technological connection to electric networks, not less than (days): Actual value: 90; 2019: 90; 2020: 90; 2021: 90; 2022: 90; 2023: 90; 2024: 90. 3. Term of technological connection to gas distribution networks: (days): Actual value: 170; 2019: 150; 2020: 135; 2021: 135; 2022: 135; 2023: 135; 2024: 135.