Проект документа: 
No
Пересмотр более раннего документа?: 
No
Год составления проекта документа: 
2011
Год вступления в силу: 
2011
Виды актов по количеству участников: 
National
Тип документа: 
Rule/Regulation
Экономический сектор: 
Energy, Power
Виды энергоресурсов: 
Power, Renewable
Подготовлен: 
Government of Malaysia
Заметки: 
Bilingual document
Сводный обзор: 
After a preliminary Part, the Rules deal with planning, connection to electricity distribution network, responsibilities and costs, commencement of operation, operation of renewable energy installation, metering and payment.
Деятельность органов власти
Energy management principles: 
Connection confirmation check. 3. (1) An eligible producer who proposes to construct- (a) a PV installation having a rated kWp exceeding 72kWp up to and including 180kWp; or (b) a non-PV installation having a net export capacity exceeding 72kWp up to and including 180kW, and connect the installation to a connection point shall, before making an application to the Authority for a feed-in approval under the Renewable Energy (Feed-In Approval and Feed-In Tariff Rate) Rules 2011 [P.U. (A) 385/2011], submit a written request to the distribution licensee whose electricity distribution network is proposed to be connected to the installation for such distribution licensee to carry out a connection confirmation check in respect of the proposed connection.