Infrastructure development priorities:
Work is [...] required during the period 1966-70 to extend the network of electricity and water supply systems.---Malaya Generation Projects (1966-1970): Batang Padang hydro-electric scheme (153MW); Prai Thermal Power Station (60MW); Port Dickson Thermal Power Station (120MW); Bentong hydro-electric scheme (14MW); Raub hydro-electric scheme (20MW); Johore Bahru thermal station 1st extension (30MW); Johore Bahru thermal station 2nd extension (30MW); Upper Perak River hydro-electric scheme [See Table 10.3].---Diesel plants will be transferred from certain West Coast power stations to the East Cost in 1966-1968.---One of the major features in the development of the Board's transmission and distribution network will be the integration of the Central Network with the Northern Zone areas by 1967 to form one national grid extending from Alor Star in the north to Kluang in the south [...].