2 Disember 2014 2 December 2014 P.U. (A) 321 | WARTAKERAJAANPERSEKUTUAN FEDERAL GOVERNMENTGAZETTE |
PERATURAN-PERATURAN BEKALAN GAS(PINDAAN) 2014 GAS SUPPLY (AMENDMENT) REGULATIONS 2014 |
DISIARKAN OLEH/ PUBLISHED BY JABATAN PEGUAM NEGARA/ ATTORNEY GENERAL’S CHAMBERS |
AKTA BEKALAN GAS 1993
PERATURAN-PERATURAN BEKALAN GAS (PINDAAN) 2014
PADA menjalankan kuasa yang diberikan oleh seksyen 39 Akta Bekalan Gas 1993 [Akta 501],
Menteri membuat peraturan-peraturan yang berikut:
Nama dan permulaan kuat kuasa
1. (1) Peraturan-peraturan ini bolehlah dinamakan Peraturan-Peraturan Bekalan Gas(Pindaan) 2014.
(2) Peraturan-Peraturan ini mula berkuat kuasa pada 1 Januari 2016.
Pindaan am
2. Peraturan-Peraturan Bekalan Gas 1997 [P.U. (A) 287/1997], yang disebut "Peraturan-Peraturan ibu"dalam Peraturan–Peraturan ini, dipinda—
(a) dengan menggantikan perkataan “Ketua Pengarah” di mana-mana jua terdapat dengan perkataan“Suruhanjaya”; dan
(b) dalam teks bahasa kebangsaan, dengan menggantikan perkataan “fee” di mana-mana juaterdapat dengan perkataan “fi”.
Pindaan peraturan 15
3. Peraturan 15 Peraturan-Peraturan ibu dipinda—
(a) dalam subperaturan (1), dengan menggantikan perkataan “pada” dengan perkataan “pada mana-mana”;
(b) dalam subperaturan (1), dengan menggantikan perkataan “atau sambungan gas” denganperkataan “, pepasangan gas tambahan atau sambungan pepasangan gas”; dan
(c) dengan memasukkan selepas subperaturan (3) subperaturan yang berikut:
“(4) Semua terma dan syarat kelulusan untuk memasang hendaklah dipatuhi oleh—
(a) pemunya pepasangan itu;
(b) orang kompeten yang dilantik untuk memberi nasihat mengenai kerja pada pepasangan itu, setakat skop kerjanya; dan
(c) Kontraktor Gas yang berdaftar dengan Suruhanjaya, yang menjalankan kerja-kerja pada pepasangan,
seperti yang terkandung dalam suatu kelulusan untuk memasang yang dikeluarkan oleh Suruhanjaya menurut subperaturan (3).
(5) Fi yang kena dibayar untuk memproses permohonan dan pengeluaran kelulusan untukmemasang adalah sebagaimana yang ditetapkan dalam Bahagian I Jadual Ketiga.”.
Pindaan peraturan 16
4. Peraturan 16 Peraturan-Peraturan ibu dipinda—
(a) dengan menomborkan semula peraturan 16 sebagai subperaturan 16(1);
(b) dalam subperaturan (1), dengan memasukkan selepas perkataan “pepasangan gas” perkataan “, pepasangan gas tambahan atau sambungan pepasangan gas”; dan
(c) dengan memasukkan selepas subperaturan (1) subperaturan yang berikut:
“(2) Suruhanjaya boleh meluluskan permohonan itu jika ia berpuas hati bahawa pemohon itu telah memenuhi kehendak Peraturan-Peraturan ini dan seterusnya mengeluarkan kelulusan untuk mengendali, yang mengandungi apa-apa terma dan syarat yang difikirkan patut oleh Suruhanjaya.
(3) Fi yang kena dibayar untuk memproses permohonan dan pengeluaran kelulusan untukmengendali adalah sebagaimana yang ditetapkan dalam Bahagian I Jadual Ketiga.”.
Pindaan peraturan 94
5. Peraturan 94 Peraturan-Peraturan ibu dipinda dengan menggantikan perkataan “Fee” dengan perkataan“Fi bagi memproses permohonan untuk peperiksaan dan fi”.
Peraturan baru 114A
6. Peraturan-Peraturan ibu dipinda dengan memasukkan selepas peraturan 114 peraturan yang berikut:
“Penggantian
Perakuan Pendaftaran Kontraktor Gas.
114A. (1) Jika Perakuan Pendaftaran Kontraktor Gas yang dikeluarkan oleh Suruhanjaya hilang, dicuri,termusnah, lusuh, atau rosak, suatu Perakuan gantian boleh dikeluarkan oleh Suruhanjaya apabilasuatu akuan berkanun bahawa salinan asal Perakuan tersebut telah hilang, dicuri ataupun termusnahdikemukakan oleh pemegang atau apabila salinan asal Perakuan yang lusuh atau rosak itu diserah balik.
(2) Fi bagi perakuan gantian yang dikeluarkan di bawah subperaturan (1) adalah sebagaimana yangditetapkan dalam Bahagian II Jadual Ketiga.”.
Pindaan peraturan 118
7. Peraturan 118 Peraturan-Peraturan ibu dipinda—
(a) dengan menomborkan semula peraturan 118 sebagai subperaturan 118(1); dan
(b) dengan memasukkan selepas subperaturan (1) subperaturan yang berikut:
“(2) Jika Perakuan Kelulusan yang dikeluarkan oleh Suruhanjaya hilang, dicuri, termusnah,lusuh, atau rosak, suatu Perakuan gantian boleh dikeluarkan oleh Suruhanjaya apabila suatuakuan berkanun bahawa salinan asal Perakuan telah hilang, dicuri atau termusnah dikemukakanoleh pemegang ataupun apabila salinan asal Perakuan yang lusuh atau rosak itu diserah balik.
(3) Fi bagi perakuan gantian yang dikeluarkan di bawah subperaturan
(2) adalah sebagaimana yang ditetapkan dalam Bahagian II Jadual Ketiga.”.
Pindaan Jadual Ketiga
8. Peraturan-Peraturan ibu dipinda dengan menggantikan Jadual Ketiga dengan Jadual yang berikut:
“JADUAL KETIGA
(Peraturan 6, 9, Subperaturan 15(5) dan 16(3), Peraturan 24, Subperaturan 88(2) dan
89(2), Peraturan 94, Perenggan 100(e), Subperaturan 101(1) dan 102(2), Peraturan 111,
Subperaturan 114A(2), 115(6), 118(1) dan 118(3)).
KERAJAN MALAYSIA AKTA BEKALAN GAS 1993 FI
BAHAGIAN I
1. Fi bagi lesen penggunaan gas (Peraturan 6)
Fi hendaklah berdasarkan isipadu gas yang dibekalkan dalam MMBTU, mengikut rekod tahunsebelumnya. Fi yang dikenakan ialah 1.1 sen/MMBTU.
(MMBTU = Million British Thermal Unit)
2. Fi bagi lesen gas persendirian (Peraturan 9)
Fi hendaklah berdasarkan kelas pepasangan gas seperti yang berikut:
| RM setahun |
(a) Pepasangan gas Kelas I | 300.00 |
(b) Pepasangan gas Kelas II | 200.00 |
(c) Pepasangan gas Kelas III | 100.00 |
3. Fi bagi kelulusan untuk memasang dan kelulusan untuk mengendali pepasangan gas (Subperaturan 15(5) dan 16(3))
RM/Perakuan
(a) Memproses dan mengeluarkan kelulusan untuk memasang 200.00
(b) Memproses dan mengeluarkan kelulusan untuk mengendali 100.00
4. Fi bagi pemeriksaan dan ujian pepasangan (Peraturan 24)
(a) Pemeriksaan RM
- Pepasangan gas Kelas I 300.00
- Pepasangan gas Kelas II 200.00
- Pepasangan gas Kelas III 100.00
- Pepasangan gas tambahan 100.00
(b) Ujian kebocoran
- Pepasangan gas Kelas I 300.00
- Pepasangan gas Kelas II 200.00
- Pepasangan gas Kelas III 100.00
- Pepasangan gas tambahan 100.00
(c) Ujian Holiday 100.00
BAHAGIAN II
1. Fi bagi Perakuan Kekompetenan gantian (Subperaturan 88(2))
RM
(a) Jurutera Gas 150.00
(b) Penyelia Kejuruteraan Gas 100.00
(c) Jurugegas Gas 50.00
2. Fi bagi pendaftaran dan pembaharuan pendaftaran bagi orang kompeten
(Subperaturan 89(2)) | RM setahun |
(a) Jurutera Gas | 150.00 |
(b) Penyelia Kejuruteraan Gas | 100.00 |
(c) Jurugegas Gas | 50.00 |
3. Fi bagi peperiksaan (Peraturan 94)
RM
(a) Fi pemprosesan peperiksaan 20.00
(b) Peperiksaan bagi Perakuan Kekompetenan sebagai Jurutera Gas
(c) Peperiksaan bagi Perakuan Kekompetenan sebagai Penyelia Kejuruteraan Gas
(d) Peperiksaan bagi Perakuan Kekompetenan sebagai Jurugegas Gas
150.00
100.00
50.00
4. Fi bagi memotong suatu sekatan dan pengendorsan suatu Perakuan Kekompetenan (Perenggan 100(e))
| RM |
(a) Jurutera Gas | 150.00 |
(b) Penyelia Kejuruteraan Gas | 100.00 |
(c) Jurugegas Gas | 50.00 |
5. Fi bagi Perakuan Kekompetenan sementara bagi orang asing (Subperaturan 101(1))
RM setahun
(a) Jurutera Gas | 150.00 |
(b) Penyelia Kejuruteraan Gas | 100.00 |
(c) Jurugegas Gas | 50.00 |
6. Fi bagi pengendorsan Perakuan Kekompetenan yang setaraf (Subperaturan 102(2))
RM
(a) Jurutera Gas | 150.00 |
(b) Penyelia Kejuruteraan Gas | 100.00 |
(c) Jurugegas Gas | 50.00 |
7. Fi bagi Perakuan Pendaftaran sebagai Kontraktor Gas (Peraturan 111 dan
Subperaturan 115(6)) | Fi pengeluaran | Fi pembaharuansetahun |
(a) Kelas A | RM 3000.00 | RM 2000.00 |
(b) Kelas B | 2000.00 | 1000.00 |
(c) Kelas C | 1000.00 | 700.00 |
(d) Kelas D | 500.00 | 300.00 |
8. Fi bagi pengeluaran dan pembaharuan Perakuan Kelulusan untuk mengilang, memasang ataumengimport gegasan gas, perkakas gas atau kelengkapan gas (Subperaturan 118(1))
Fi pengeluaran RM
Fi pembaharuan setahun
RM
(a) Pengilang/Pemasang 500.00 250.00
(b) Pengimport 800.00 400.00
9. Fi bagi pengeluaran dan pembaharuan Perakuan Kelulusan bagi penjualan atau penggunaan mana-mana gegasan gas, kelengkapan gas atau perkakas gas
(Subperaturan 118(1)) | Fi pengeluaran | Fi pembaharuansetahun |
(a) Gegasan gas | RM 100.00 | RM 100.00 |
(b) Kelengkapan gas | 200.00 | 200.00 |
(c) Perkakas gas | 110.00 | 110.00 |
10. Fi bagi perakuan gantian selain daripada perakuan kekompetenan (Subperaturan 114A (2) dan subperaturan 118(3))
RM
(a) Pendaftaran Kontraktor Gas 35.00
(b) Perakuan Kelulusan 35.00
Dibuat 17 November 2014 [UPE(S)25/16/68 Sj 1 Jld.5;PN(PU2)528/II]
DATO’ SRI MOHD. NAJIB BIN TUN HAJI ABDUL RAZAK
Perdana Menteri
---
GAS SUPPLY ACT 1993
GAS SUPPLY (AMENDMENT) REGULATIONS 2014
IN exercise of the powers conferred by section 39 of the Gas Supply Act 1993 [Act 501], the Minister makes thefollowing regulations:
Citation and commencement
1. (1) These regulations may be cited as the Gas Supply (Amendment) Regulations 2014.
(2) These Regulations come into operation on 1 January 2016.
General Amendment
2. The Gas Supply Regulations 1997 [P.U. (A) 287/1997], which are referred to as the “principalRegulations” in these Regulations, are amended—
(a) by substituting for the words “Director General” the words “the Commission”, whereverappearing; and
(b) in the national language text, by substituting for the word “fee” the word “fi”, whereverappearing.
Amendment of regulation 15
3. Regulation 15 of the principal Regulations is amended─
(a) in subregulation (1), by substituting for the word “a” before the word “new” the word “any”;
(b) in subregulation (1), by substituting for the words “or gas extension” the words “, additional gasinstallation or extension of gas installation”; and
(c) by inserting after subregulation (3) the following subregulations:
“(4) All the terms and conditions of the approval to install shall be complied with by—
(a) the owner of the installation;
(b) the competent person engaged to advice on the work on the installation, to theextent of his scope of work; and
(c) the Gas Contractor registered with the Commission, carrying out the work on theinstallation,
as contained in an approval to install issued by the Commission pursuant to subregulation (3).
(5) The fee payable for processing the application for and the issuance of the approval to installis as prescribed in Part I of the Third Schedule.”.
Amendment of Regulation 16
4. Regulation 16 of the principal Regulations is amended—
(a) by renumbering regulation 16 as subregulation 16(1);
(b) in subregulation (1), by inserting after the word “installation” the words “, additional gasinstallation or extension of gas installation”; and
(c) by inserting after subregulation (1) the following subregulations:
“(2) The Commission may approve the application if it is satisfied that the applicant hasfulfilled the requirements of these Regulations and subsequently issue an approval to operate,containing such terms and conditions as it deems fit.
(3) The fee payable for processing the application for and the issuance of the approval tooperate is as prescribed in Part I of the Third Schedule.”.
Amendment of Regulation 94
5. Regulation 94 of the principal Regulations is amended by substituting for the word “The” the words“The processing fee for an application for examination and the”.
New Regulation 114A
6. The principal Regulations are amended by inserting after regulation 114 the following regulation:
“Replacement of Certificate of Registration of Gas Contractor.
114A. (1) If a Certificate of Registration of a Gas Contractor issued by the Commission is lost, stolen,destroyed, mutilated, or defaced, a replacement of the Certificate may be issued by the Commission on production of a statutory declaration by the holder that the original Certificate has been lost, stolen ordestroyed or upon surrender of the mutilated or defaced original Certificate.
(2) The fee for the replacement certificate issued under subregulation (1) is as prescribed in Part II of the Third Schedule.”.
Amendment of Regulation 118
7. Regulation 118 of the principal Regulations is amended—
(a) by renumbering regulation 118 as subregulation 118(1); and
(b) by inserting after subregulation (1) the following subregulations:
“(2) If a Certificate of Approval issued by the Commission is lost, stolen, destroyed,mutilated, or defaced, a replacement of the Certificate may be
issued by the Commission on production of a statutory declaration by the holder that the original Certificate has been lost, stolen or destroyed or upon surrender of the mutilated ordefaced original Certificate.
(3) The fee for the replacement certificate issued under subregulation
(2) is as prescribed in Part II of the Third Schedule.”.
Amendment of the Third Schedule
8. The principal Regulations are amended by substituting for the Third Schedule the following Schedule:
“THIRD SCHEDULE
(Regulations 6, 9, Subregulations 15(5) and 16(3), Regulation 24, Subregulations 88(2)
and 89(2), Regulation 94, Paragraph 100(e), Subregulations 101(1) and 102(2),
Regulation 111, Subregulations 114A(2), 115(6), 118(1) and 118(3)).
GOVERNMENT OF MALAYSIA GASSUPPLY ACT 1993
FEE
PART I
1. Fee for gas utility licence (Regulation 6)
The fee shall be based on the volume of gas supplied in MMBTU, in accordance with the previous year's record. The unit of fee charged shall be 1.1 sen/MMBTU. (MMBTU = Million British ThermalUnit)
2. Fee for private gas licence (Regulation 9)
The fee shall be based on the class of gas installation as follows:
| RM per year |
(a) Class I gas installation | 300.00 |
(b) Class II gas installation | 200.00 |
(c) Class III gas installation | 100.00 |
3. Fee for approval to install and approval to operate for gas installation
(Subregulations 15(5) and 16(3)) | RM/Certificate |
(a) Processing and issuance of approval to install | 200.00 |
(b) Processing and issuance of approval to operate | 100.00 |
4. Fee for inspection and tests of installation (Regulation 24) | |
(a) Inspection | RM |
i. Class I gas installation | 300.00 |
ii. Class II gas installation | 200.00 |
iii. Class III gas installation | 100.00 |
iv. Additional gas installation | 100.00 |
(b) Leak Test - Class I gas installation
| 300.00 |
ii. Class II gas installation | 200.00 |
iii. Class III gas installation | 100.00 |
iv. Additional gas installation | 100.00 |
(c) Holiday Test | 100.00 |
PART II | |
4. Fee for replacement of Certificate of Competency (Subregulation 88(2))
RM
(a) Gas Engineer 150.00
(b) Gas Engineering Supervisor 100.00
(c) Gas Fitter 50.00
5. Fee for registration and renewal of registration for competent person
(Subregulation 89(2)) | RM per year |
(a) Gas Engineer | 150.00 |
(b) Gas Engineering Supervisor | 100.00 |
(c) Gas Fitter | 50.00 |
6. Fee for examinations (Regulation 94)
RM
(a) Examination processing fee 20.00
(b) Examination for a Certificate of Competency as a Gas Engineer
(c) Examination for a Certificate of Competency as a Gas Engineering Supervisor
(d) Examination for a Certificate of Competency as a Gas Fitter
150.00
100.00
50.00
7. Fee for removal of a restriction and endorsement of a Certificate of Competency (Paragraph 100(e))
| RM |
(a) Gas Engineer | 150.00 |
(b) Gas Engineering Supervisor | 100.00 |
(c) Gas Fitter | 50.00 |
8. Fee for temporary Certificate of Competency for a foreign person
(Subregulation 101(1)) | RM per year |
(a) Gas Engineer | 150.00 |
(b) Gas Engineering Supervisor | 100.00 |
(c) Gas Fitter | 50.00 |
9. Fee for endorsement of equivalent Certificate of Competency
(Subregulation 102(2)) | RM |
(a) Gas Engineer | 150.00 |
(b) Gas Engineering Supervisor | 100.00 |
(c) Gas Fitter | 50.00 |
10. Fee for Certificate of Registration as Gas Contractor (Regulation 111 and
Subregulation 115(6)) | Issuance fee | Renewalper year |
(a) Class A | RM 3000.00 | RM 2000.00 |
(b) Class B | 2000.00 | 1000.00 |
(c) Class C | 1000.00 | 700.00 |
(d) Class D | 500.00 | 300.00 |
11. Fee for issuance and renewal of Certificate of Approval to assemble, manufacture or import any gasfitting, gas appliance or gas equipment (Subregulation 118(1))
Renewal
| Issuance fee | per year |
RM | RM |
(a) Manufacturer/Assembler | 500.00 | 250.00 |
(b) Importer | 800.00 | 400.00 |
12. Fee for issuance and renewal of Certificate of Approval for sale or use of any gas fitting, gas equipment or gas appliance (Subregulation 118(1))
| Issuance fee | Renewal per year |
RM | RM |
(a) Gas fitting | 100.00 | 100.00 |
(b) Gas equipment | 200.00 | 200.00 |
(c) Gas appliance | 110.00 | 110.00 |
13. Fee for replacement of certificate other than certificate of competency (Subregulation 114A(2) andSubregulation 118(3))
RM
(a) Registration of Gas Contractor 35.00
(b) Certificate of Approval 35.00
Made 17 November 2014
[UPE(S)25/16/68 Sj 1 Jld.5; PN(PU2)528/II]
DATO’ SRI MOHD. NAJIB BIN TUN HAJI ABDUL RAZAK
Prime Minister