Energy management principles:
3. Wind Turbine Generator Technology Requirements.
The criteria of Wind Turbine Generator (WTG) selection shall be based on compatibility with the National Grid System/DISCO Systems, Improved operating performance, and optimal efficiency.
4. Generator Data Requirements.
A grid connected Wind Power Plant shall be required to provide "Generator Data" applicable to the type of the Wind Turbine Generator (WTG) being installed. In addition, the Wind Power Plant shall provide Standard Planning Data as outlined in the Grid Code to the extent applicable.