Overall Summary: 
The National Transmission and Despatch Company (NTDC) Grid Code Addendum - II for Integration of Solar Power Plants 2014 amends the National Transmission and Despatch Company (NTDC) Grid Code 2005 by integrating into it Photovoltaic (PV) and Concentrated Solar Power (CSP) plants.
Governance
National policy structure: 
(i) This addendum is applicable to only Grid Connected PV/CSP power plants. (ii) This addendum becomes part of Grid Code with immediate effect.