Meta Data Draft: NoRevision of previous policy?: YesDraft Year: 2005Effective Start Year: 2014Scope: NationalDocument Type: CodeEconomic Sector: PowerEnergy Types: Power, Renewable, SolarIssued by: National Transmission and Despatch CompanySource: National Transmission and Despatch CompanyFile: NTDC Grid code Addendum - II for integration of Solar Power Plants 2014Overall Summary: The National Transmission and Despatch Company (NTDC) Grid Code Addendum - II for Integration of Solar Power Plants 2014 amends the National Transmission and Despatch Company (NTDC) Grid Code 2005 by integrating into it Photovoltaic (PV) and Concentrated Solar Power (CSP) plants. Related Documents Other policies that are related to this one. National Transmission and Despatch Company (NTDC) Grid Code Addendum - I for integration of Wind Power Plants 2010National Transmission and Despatch Company (NTDC) Grid Code 2005 Governance National policy structure: (i) This addendum is applicable to only Grid Connected PV/CSP power plants. (ii) This addendum becomes part of Grid Code with immediate effect.