Infrastructure development priorities:
In order to achieve the goals of the General scheme, the following tasks need to be solved:
analysis of the current state of the electric power industry and the existing structure of power generation and grid facilities;
development of evidence-based proposals for the optimal (rational) structure of generating capacity;
development of evidence-based proposals on the volume of decommissioning of generating equipment, modernization of equipment or replacement of existing generating capacity with new equipment;
development of proposals on the composition of power plants, including their characteristics and location;
development of perspective balances of power and electric energy in the Unified energy system of Russia, combined energy systems and technologically isolated territorial electric power systems until 2035;
forecast of demand for fuel;
development of proposals for the development of the main electric network of the Unified energy system of Russia with a voltage of 330 kV and above.